This shows you the differences between two versions of the page.
release_4.1 [2017/07/29 14:32] admin created |
release_4.1 [2020/12/23 17:11] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | [[Release Notes|<< | ||
+ | ====== Release 4.1 - Key Features ====== | ||
+ | ===== Tallied Requirements! ===== | ||
+ | Requirements that are counted (e.g., number of environmental projects, the hours of community service, the nights of winter camping, the number of 2-night lightweight camps, etc.) now have a tally associated with them, for each youth. The tally can be increased manually (from the floaty), or can be done (semi-)automatically when an event completes. I.e., if you hold a 2-night fall camp, after the fact you can give each youth credit for their participation, | ||
+ | |||
+ | Smarter auto-linking of Related Requirements: | ||
+ | |||
+ | Easier updating of an event' | ||
+ | |||
+ | In Bulk editing from the " | ||
+ | |||
+ | In Bulk editing now lets you uncheck requirements. If you inadvertently checked off Blue Star #B2 for the whole pack (when you really meant #B3), you can just as easily uncheck it. | ||
+ | |||
+ | The old " | ||
+ | |||
+ | ===== Miscellaneous Enhancements ===== | ||
+ | |||
+ | Configurable start date. Some groups start their new year an the end of August, and others try to squeeze an early camp in. So the date currently defaults to Aug 15th, but if you want to change that, just give me an email. | ||
+ | |||
+ | Simplified "set default meeting" | ||
+ | |||
+ | Performance improvements during scorecarding. Probably only noticeable for sections using CubSys/ | ||
+ | |||
+ | Added new Scout and Cub slides to inventory. | ||
+ | |||
+ | ===== Bug Fixes ===== | ||
+ | * Changing the badge awarded date for a youth caused all that youth' | ||
+ | * "Ready to Award" report was showing date picker, even if no badges were listed. | ||
+ | *Youth overrides were also being displayed after Leaders in event summary. | ||
+ | * PACK: World Citizen #2c completion logic was giving misleading percentage complete. | ||
+ | * COMPANY: typos in badge requirements. | ||
+ | * Ready-to-test subrequirements were not being cleared when the parent req was completed. | ||
+ | * Ready-to-test optional requirements were not being cleared when the badge was complete. | ||
+ | * If there are no upcoming events, and you toggled from calendar to list view, you couldn' | ||
+ | * Couldn' | ||
+ | * Various iPhone rendering tweaks. |